{"product_id":"tandem-20-long-lead","title":"Tandem 20' Long Lead","description":"\u003cp class=\"isSelectedEnd\"\u003e\u003cstrong\u003e\u003cspan\u003eLong-range freedom. Close-working versatility.\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp class=\"isSelectedEnd\"\u003e\u003cspan\u003eBuilt for training, service-dog work, and situations where more working distance is needed, the Tandem 20' Long Lead provides room to move while maintaining a dependable connection between dog and handler.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"isSelectedEnd\"\u003e\u003cspan\u003eMade from \u003c\/span\u003e\u003cstrong\u003e\u003cspan\u003e5\/8\" Heavy Duty BioThane®\u003c\/span\u003e\u003c\/strong\u003e\u003cspan\u003e in Dark Brown and finished with \u003c\/span\u003e\u003cstrong\u003e\u003cspan\u003e304 stainless steel hardware\u003c\/span\u003e\u003c\/strong\u003e\u003cspan\u003e, it is waterproof, easy to clean, and built for repeated outdoor and training use.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"isSelectedEnd\"\u003e\u003cspan\u003eA stainless steel \u003c\/span\u003e\u003cstrong\u003e\u003cspan\u003eO-ring integrated into the handle\u003c\/span\u003e\u003c\/strong\u003e\u003cspan\u003e adds another level of versatility. Feed the lead through the O-ring to create a cross-body configuration when temporary hands-free carrying is useful.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"isSelectedEnd\"\u003e\u003cspan\u003eOriginally developed in response to the needs of service-dog training, the design reflects the purpose of the Tandem Collection: practical gear built around the working partnership between dog and handler.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\u003cspan\u003eDetails\u003c\/span\u003e\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003e20' finished length\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003e5\/8\" Heavy Duty BioThane®\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003eTimber\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003e304 stainless steel hardware\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003eFixed loop handle\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003eStainless steel O-ring at handle\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003e\u003cspan\u003eConvertible cross-body configuration\u003c\/span\u003e\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003eWaterproof and easy to clean\u003c\/li\u003e\n\u003cli\u003eHandcrafted in Michigan\u003c\/li\u003e\n\u003cli\u003eBacked by our Lifetime Guarantee\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003e\u003cspan\u003eCross-Body Configuration\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp class=\"isSelectedEnd\"\u003e\u003cspan\u003ePass the lead through the stainless steel O-ring at the handle to create a temporary cross-body configuration for carrying or hands-free use.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan\u003eFor controlled dogs and appropriate working situations. Always maintain awareness of the additional line when using a long lead.\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"Red Maple K9 Gear","offers":[{"title":"Default Title","offer_id":52901942526181,"sku":null,"price":59.0,"currency_code":"USD","in_stock":true}],"url":"https:\/\/redmaplek9gear.com\/products\/tandem-20-long-lead","provider":"Red Maple K9 Gear","version":"1.0","type":"link"}