Tandem 20' Long Lead

      Color: Saddle
      Sale price $84.00Regular price
      Regular price $84.00

      Made to order in Augusta, Michigan

      Backed by our Lifetime Guarantee

      Free shipping on U.S. orders of $85+

      Built for Partnership.

      The Tandem 20' Long Lead gives a young dog room to move while keeping a dependable connection to the handler. It was developed for service-dog puppies in training: recall practice, supervised exploration and play, where distance matters more than close control.

      A stainless steel O-ring at the handle converts the lead to a hands-free cross-body carry. Feed the line through the O-ring and wear it across the body, with no separate belt or extra hardware.

      Made from 5/8" Super Heavy BioThane® in Saddle, Onyx or Harbor with 304 stainless steel hardware. It is waterproof, wipes clean and holds up to repeated outdoor use.

      Handcrafted in Michigan. Backed by our Lifetime Guarantee.

      Made to order. Ships within 1 business day. Free shipping on U.S. orders of $85 or more.

      Details
      • 20' finished length
      • 5/8" Super Heavy BioThane®
      • Saddle, Onyx or Harbor
      • 304 stainless steel snap
      • 304 stainless steel O-ring at handle
      • 304 stainless steel Chicago screws, secured with threadlocker
      • Fixed loop handle
      • Convertible hands-free cross-body carry
      • Waterproof and easy to clean
      Colorways
      • Saddle — Super Heavy BioThane® Brown 523
      • Onyx — Super Heavy BioThane® Black
      • Harbor — Super Heavy BioThane® Navy

      Swatches are on the Color Chart.

      Cross-Body Configuration

      Pass the lead through the stainless steel O-ring at the handle and wear it across the body for hands-free carrying.

      For supervised training and play. Always stay aware of the extra line when using a long lead.

      Shipping & Returns

      Made to order. Ships within 1 business day, then 3–7 business days by standard shipping. Standard shipping is $8, or free on orders of $85 or more. See Shipping & Returns.

      Unused standard items can be returned within 30 days of delivery.

      How It's Built

      We use waterproof BioThane® webbing for gear that cleans easily after mud, rain, trail days, and regular use. It is practical, low-maintenance, and built for the conditions dogs actually encounter.

      Hardware is selected by application—not simply appearance. Across our gear, we use solid brass, 304 stainless steel, 316 stainless steel, aluminum, and select KONG® marine bronze components based on the role of the part and intended environment.

      Every product starts with that question. Materials, hardware, width, length, fit, and closure style are chosen to serve the dog, the handler, and the work ahead.

      If a Red Maple K9 Gear product fails during normal, intended use, we will replace it. Damage from chewing, misuse, modification, or accidents is not covered.

      More From the Workshop